Capital Campaign Status

Click here to read our most recent report on roof repairs and other maintenance needs as of May 2016.

Past Reports with photos of roof and window repairs
  • As of September 2015: Copper gutter and start of slate installation  (south lower roof)
    • Repairs to 119 windows were finished in early spring; more have been sealed and completed
    • Interior doors have been redone and memorialized
    • Work on the roof is in full swing
    • Roof piping and bell tower side damage will be next project
    • Pews sectioned off on Mary’s side getting varnished and cleaned first, then Joseph’s side and then the center (should be done by the end of summer)
    • Floors will be worked on probably at the end of winter
    • Windows in the hall have been fixed
    • Rectory 3rd floor has been painted and new carpet installed
    • New tiles and carpeting in the basement
  • As of July 2015: Upper and lower roof repair (school side)
  • Lower Church roof (school side)
  • Chapel roof (completed)
  • Windows in the altar server sacristy (completed)